104 Emerald St, Keene, NH  ·  Mon–Sat 8:30–6, Sun 11–3 (603) 795-0100 Book a Consult

Home / Build / Kitchens

Kitchens, designed and built by one team

The project we do most. Layout, cabinetry, counters, appliances and install — selections made in the showroom, priced honestly, and built by the crew that sourced the materials.

★★★★★Kitchen remodels across ~48 Monadnock towns Typical on-site window: 6–9 weeks One project manager · weekly updates · one punch list
What's in the scope

Everything a kitchen touches, in one contract

Because the showroom, the fabrication and the crews are one operation, what you pick is what gets built.

Layout

Design & a real number

We measure, draw options, and price it — including subfloor, electrical to code and the parts most bids leave out. You approve scope and cost before demo.

Cabinetry

Stock to full custom

Cab-Tec, J&K, KCD, Wolf and Vermont Cabinetry — see the real door and drawer box before you order. Cabinetry

Counters

Stone, templated in-house

Granite, quartz, quartzite and porcelain — laser-templated, fabricated and set by the same crew. Countertops

Surfaces

Tile, backsplash & floor

Full-height backsplashes, floors and the trim that finishes the room, set by our own tile crews. Tile

Appliances

Specified, not guessed

Fulgor Milano, ILVE, KitchenAid and vent hoods — with a real allowance, sized to the layout. Fixtures & appliances

Faucets & sink

Pfister & Gerber, drilled to spec

Pull-down, touchless or a pot filler over the range — chosen at templating so the holes in the stone are right. Kitchen faucets, sinks

The build

In-house crews, vetted subs

Demo, carpentry and finish by our people; electrical and plumbing by subs we've run for years — all under our GC.

Kitchen services

The parts of a kitchen, individually

Recent kitchens

Monadnock-region kitchens

See the full portfolio

What does a kitchen remodel cost here?

A refresh runs roughly $18k–$35k; a mid remodel $35k–$70k; a full remodel with moved walls and custom cabinetry $70k–$130k+. See the breakdown in our cost guide or run the budget calculator.

How long will I be without a kitchen?

6–9 weeks on site for a typical full remodel, plus a 1–2 week gap while counters are fabricated after templating. We help you set up a temporary kitchen.

Can you work from my designer's plans?

Yes — bring the drawings and we'll build from them, or use our design-only package the other way around.

Do you move walls and windows?

Regularly. Structural design, permitting and tying new framing into an old house are part of what we do.

Start here

Book a consult

Tell us the room, a rough budget range and when you'd like to start. We'll come back with next steps and a realistic timeline — no pressure, no mystery pricing.

(603) 795-0100  ·  toll-free 844-438-7674 sales@poshhaus.com 104 Emerald St, Keene, NH 03431 Mon–Sat 8:30–6 · Sun 11–3

We reply within one business day. Your details go straight to our team at sales@poshhaus.com.