How to plan a kitchen remodel, step by step

A kitchen remodel goes smoothly when the decisions happen in the right order. Here is the sequence we follow with clients in the Monadnock Region, from first idea to the day you cook in the new kitchen.
1. Goals and must-haves
List what bothers you about the current kitchen and what you want most: more storage, an island, better light, room for two cooks. Save photos you love to your Ideabook and pull them into a mood board.
2. Budget
Set a range and a 10% contingency. The budget breakdown shows where the money goes, and our kitchen remodel cost guide has New Hampshire numbers.
3. Layout
Decide whether the layout stays or changes. Moving plumbing, gas or walls adds cost but can transform how the kitchen works. Test ideas in the kitchen layout planner and check the work triangle.
4. Selections
Choose in this order: appliances (they set cabinet sizes), then cabinets, then countertops, then sink and faucet, backsplash, lighting and hardware. See cabinet sizes.
5. Permits and ordering
Structural, electrical and plumbing changes usually need permits; see remodel permits in NH. Order long-lead items like cabinets and appliances early.
6. Construction
A typical kitchen takes 4 to 8 weeks of construction once materials are on site. Set up a temporary kitchen (see living without a kitchen) and book a consult when you are ready to plan it with us.
Common questions
What is the first step in planning a kitchen remodel?
Define your goals and budget, then decide whether the layout will change.
In what order should I choose kitchen finishes?
Appliances first, then cabinets, countertops, sink and faucet, backsplash, lighting and hardware.
How long does a kitchen remodel take?
Usually 4 to 8 weeks of construction after materials arrive, plus design and ordering time before that.